Learn
The questions buyers ask while they plan a steel building, answered properly. No dates on these — they get revised when something changes rather than replaced by a newer post that says the same thing.
What a steel building actually costs
The kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.
How to compare steel building quotes
Seven questions that make two quotes comparable, what a non-answer sounds like, and our answers to all seven.
Erecting your building
Not part of the kit. The sequence, the questions to ask an erector, and a straight answer on doing it yourself.
Wind and snow loads
Design loads come from your address, not your state — which is why no honest quote starts with a state name, and why there are no numbers on this site.
Steel building foundations
Not part of the kit, and your drawings set it up. Why a rigid frame needs footings rather than a plain slab, the four shapes it takes, and the sequence from drawings to slab.
How to get a permit for a metal building
Order first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
Waiting on your land? Order your building now
Lock your price and finish the design while your land closes; the engineering follows the day your address is set.
Waiting on financing? Lock your price now
Order to lock your building's price while your loan comes through, and have the design and engineering done by the time it closes.
Should you wait for steel prices to drop?
Steel has been rising. Why locking your price at order beats betting on the market.
Can you put up a metal building yourself?
Yes. Pre-cut, pre-drilled and bolted together, with the drawings to put it up. What comes in the kit and what you need on site.
Metal building with an overhead crane
The crane is part of the frame, not an accessory. Six things about the crane that decide the building, why hook height sets the eave, and top-running, underhung or gantry.
How a bridge crane changes your steel building
Brackets at every frame, runway beams that are deliberately not tied together, heavier columns and bracing for the crane's travel. Each part, and why it is there.
Building an indoor sports facility
Turf fieldhouses, indoor soccer, baseball training, basketball gyms and multi-sport complexes. What the sport asks of the building, and what drives the cost to build one.
Equipment dealership buildings
Sales, service and parts under one roof. Why the service shop decides the building: machine height, doors, cranes, wash bay and room to grow.
Buildings for transfer stations and recycling centers
Clear span for trucks and loaders, push walls, big doors and a building that lives with corrosion.
Ice rink construction
A clear span over the ice and an envelope that fights condensation. What the building does, what the rink contractor does.
Salt storage buildings
Road salt, sand, fertilizer and frac sand. Why the pile is the design, what bin walls do, and how to fight corrosion.
Mining and oil field buildings
Haul trucks, rigs and heavy cranes. Where a pre-engineered steel building fits, and where it does not.
Aircraft hangar doors
Bi-fold, hydraulic and sliding doors, and what each one puts on the frame.
Ready to price your building?
Most Stonebolt projects start around $24,000 and run from 30 × 40 up. If that fits your budget, we'd like to hear about your project.