What a steel building actually costs
Search this question and you will find article after article that never answers it. Here is the honest version: the kit is one of five costs, we publish ours, and for the other four we will tell you who quotes them and what to ask.
Start with the number we can give you
A Stonebolt kit is priced by width and square footage, and the starting prices are published. Three points across the list, to anchor the scale:
| Size | Square feet | Starting price, delivered |
|---|---|---|
| 30 × 40 | 1,200 | $23,950 |
| 40 × 60 | 2,400 | $40,920 |
| 60 × 100 | 6,000 | $92,400 |
Freight is inside those numbers, not added to them. How far above the starting price you land is set mostly by your county's design loads and your eave height. Prices for popular sizes →
The kit is one line item of five
This is the part the category leaves out. Four of these five are local costs, by others, that we do not quote and will not guess at. The kit is the one we price, and it comes with the drawings the other four are built from.
The building kit
We price thisPrimary and secondary framing, roof and wall panels, trim, fasteners, framed openings, stamped drawings, and freight to your site.
- Who quotes it
- Us, or whichever manufacturer you buy from.
- What to ask for
- Ask for the price with freight in it, and ask whether the drawings are sealed by an engineer licensed in your state. Both are included in ours; neither is universal.
- How it is priced
- Our quote lists what is in the kit and what is by others, so it lays side by side with any other quote for “the same building.”
Concrete and foundation
Local costAn engineered slab or pier foundation with anchor bolts, designed to carry the reactions in your drawings.
- Who quotes it
- A local concrete contractor, working from the reaction plans and anchor bolt patterns in the drawings we ship.
- What to ask for
- Give them the reaction plan from your drawings, and they price the slab from what the building actually carries.
- How it is priced
- Slab cost follows your ground and your county, which is why it is priced locally rather than inside the kit.
Erection labor
Local costThe crew and equipment that put the building up, including the crane or telehandler for the primary frames.
- Who quotes it
- A local erection crew. Some buyers with the equipment and the time do it themselves.
- What to ask for
- Ask whether the quote includes the lift equipment and how many days they have allowed. Your delivery date is on your quote, so the crew can book around it.
- How it is priced
- Erection is usually priced per square foot, with your site's access, slope, and crane reach factored in by the crew.
Site work and off-load
Local costGrading, access for a loaded truck, drainage, utilities — and equipment at your site on delivery day to get the building off the trailer.
- Who quotes it
- An excavation contractor, plus whatever you arrange for off-load.
- What to ask for
- Ask what a fully loaded semi needs to reach the pad and turn around. Ask what off-load equipment your building requires; we tell you well before delivery.
- How it is priced
- The driver delivers to your site; getting the building off the trailer is done with equipment you arrange.
Permits and fees
Local costYour jurisdiction's building permit, plan review, and any impact or connection fees.
- Who quotes it
- You, filing with your local authority using the stamped drawings we provide.
- What to ask for
- Your pre-engineered metal building drawings come stamped for your state and engineered to your county's requirements, ready for your permit submission.
- How it is priced
- Permit and plan-review fees are set by your county, and fee schedules are usually published.
Why there is no total on this page
Because we would have to invent it. Concrete, erection, site work and permits are priced by local contractors and local authorities, and they vary by ground conditions, access, crew availability and county — not by anything we can see from here.
We could publish a national average. It would make this page look more complete and it would be worthless to you, because your project is not the average of anything. A number we invented is exactly what we are asking you to distrust everywhere else.
So: our line is exact and published. The other four are priced locally, from the drawings that come with your kit. Start with ours on the quote form and we will build it around your site.
Take this to the other quotes
None of these questions are about us. They are the ones that make two steel building quotes actually comparable, and our quote answers all six in writing.
- 1Is freight included in this price, or added later?
- 2Are the drawings sealed by an engineer licensed in my state?
- 3What is the deposit, and when is it due?
- 4If I cancel, what do I get back and by when?
- 5What is on the exclusion list for this quote?
- 6How long does this price hold?
Ours are answered on What's Included and the FAQ.
Before you buy
- Should you wait for steel prices to drop?Steel has been rising. Why locking your price at order beats betting on the market.
- Waiting on financing? Lock your price nowOrder to lock your building's price while your loan comes through, and have the design and engineering done by the time it closes.
- Waiting on your land? Order your building nowLock your price and finish the design while your land closes; the engineering follows the day your address is set.
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
Price your footprint
Our starting price for any size, without giving us a name or a phone number.
Ready to price your building?
Most Stonebolt projects start around $24,000 and run from 30 × 40 up. If that fits your budget, we'd like to hear about your project.