80x120 by eave height
Starting prices, delivered to your site with engineered drawings sealed in your state. Each height has its own page with what fits and the door it takes.
| Building | Starts at | Overhead door | Good for |
|---|---|---|---|
| 80x120x12 | $135,580 | up to about 10 ft | Cars, pickups and a working shop |
| 80x120x14 | $139,680 | up to about 12 ft | Equipment, service trucks and a car lift |
| 80x120x16 | $144,480 | up to about 14 ft | RVs, semis and storage up high |
| 80x120x18 | $149,300 | up to about 16 ft | Combines, semis with room overhead, racking three high |
| 80x120x20 | $154,100 | up to about 18 ft | Crane bays, tall racking and the biggest equipment |
Any other eave height is built to order and priced on your quote. Door height is confirmed on your drawings.
What moves the price from here
At eighty feet of clear span the frame is the dominant cost and everything else sits on top of it. The published price is only the start, because buildings this size cover genuinely different specifications — eave height, the number and size of the openings, and the design loads acting on that span — rather than because the footprint is uncertain.
The biggest movers, in order: design loads set by your county, eave height, and how many openings you cut into the walls. Freight is already inside the number rather than added to it.
What actually fits in 9,600 sq ft
- Manufacturing with material handling — Production plus the staging, aisles and equipment that move around it, on one uninterrupted floor.
- Distribution and racked storage — A hundred and twenty feet of depth is enough for racking with real aisles designed around powered equipment.
- Large-vehicle and fleet operations — Where several large machines are inside at once and none of them should have to be moved to reach another.
- Multi-tenant or multi-function — A hundred and twenty feet divides cleanly, and eighty feet of width means each division is still a usable building.
Eave height, sized to what goes inside
At this scale the eave follows the racking plan or the material handling equipment, and it is usually the largest cost variable after the span itself. Tell us about those and we design the building around them, so the clear height matches the forklift and the racking it has to serve.
Tell us what is going inside and we size the eave height around it. If you are between two numbers, we will go over whether the difference matters when we quote.
When 80 × 120 is the wrong answer
Eighty feet of clear span is expensive and only worth buying if the clear span is the requirement. If nothing has to cross the building in one unobstructed run, a longer building on a narrower frame delivers the same floor in a longer shape.
What the next sizes cost
Cost per square foot generally falls as the building gets bigger, so the next sizes up are worth a look.
| Size | Square feet | Starting price | Per sq ft |
|---|---|---|---|
| 80 × 120 | 9,600 | $144,480 | $15.05 |
| 80 × 100 | 8,000 | $120,800 | $15.10 |
| 100 × 100 | 10,000 | $148,500 | $14.85 |
| 60 × 120 | 7,200 | $109,080 | $15.15 |
The comparison that matters is 100 × 100 — four hundred more square feet for a higher starting price, and the difference is the span. If a hundred feet of unobstructed width is not doing a specific job, this is the lower-priced building.