The price on your quote is the price
It does not move after you pay the deposit. Not when steel moves, not when the drawings come back, not at delivery.
We are putting that first because of what it is answering. The most common story in this industry runs the same way every time: an unusually low quote, pressure to put money down quickly to lock in a steel price, and then a materially higher number some weeks later, once the deposit is spent and leaving is expensive.
A price that cannot move afterward is the only real answer to that, and it is only worth anything in writing. It is on your quote.
The payment schedule
Three payments. You will have read all three figures, and the price they come from, before you are asked for anything.
| Amount | When | What it is |
|---|---|---|
| 35% | At order | Paid when you sign. It starts engineering on your building and carries your order through your approvals. |
| 32.5% | When you give final fabrication approval | Your deposit carries your order through engineering and your approvals — door openings, colors and the rest — so you can check and adjust the design without starting fabrication. This payment is due when you are ready for your building to go into final fabrication. |
| 32.5% | At delivery | The final payment, due when the building arrives. Freight is already inside the price and is never a separate line. |
Waiting on financing? Lock your price now →Waiting on your land? Order your building now →
Why the middle payment sits where it does
Look at what the second payment is attached to. Two thirds of the cost of your building is not due until you have seen the engineered drawings — your dimensions, your openings, your site's design loads — and told us they are right.
That ordering is the point. It means the largest part of your money is behind a gate you control rather than one we do, and it means the drawings get read carefully, because they are the thing standing between you and the next payment.
If you cancel
You have 72 hours from signing to cancel and have your deposit returned in full. If the law where your building is going gives you longer, the longer period applies — we will not use a shorter window than your state gives you.
After that, the deposit is not refundable. Once you have given final fabrication approval, that payment is not refundable either.
Why it works that way
A steel building kit is manufactured to your dimensions and to the design loads at your address. It is not a stock item that goes back on a shelf — there is no next buyer for a building sized to your site. Engineering starts and steel is procured against your order, and both cost real money before anything is delivered.
Every manufacturer in this category takes a substantial deposit for that reason, and we would be skeptical of one that did not. The difference worth looking for is not whether a company takes a deposit. It is whether the company told you the number, the schedule and the cancellation rule before you paid, or after.
Check your quote line by line
This is the part we would most like you to actually do. Read the quote line by line and check it against what you asked for:
- The dimensions. Width, length and eave height. Eave height is the one people discover is wrong late, and it is the one that cannot be changed afterward.
- Every framed opening. Each door and window, its size, and which wall it is in. Openings are engineered into the wall; adding one later means cutting into a structural panel.
- What is in the package and what is not. Concrete, erection labor, doors and windows themselves, insulation and permits are separate. The full list is published.
- The name on the quote. There is a person responsible for your order and their details are on the document. That does not change once you have paid.
Call us about anything that does not match. We would far rather sort it out with you now than have you find a mismatch in month four.
Ask everyone else the same questions
None of this is only about us, and the most useful thing on this page might be that it gives you a list. Ask every company you are talking to:
- What is the deposit, as a number, and what is the rest of the schedule?
- Can the price change after I pay? If so, under what circumstances, and where is that written?
- If I cancel, what do I get back, and by when?
- Is freight in the price, or does it arrive as a line later?
Then ask them to point at the page on their website where the answers are written down. That last part is the whole test. An answer given on the phone by a salesperson is not a policy, and you will not be able to check it later.
Seven questions that make two quotes comparable → · The rest of our terms →
