Height is capacity
Most published prices in this industry are for one standard height, so height gets lost in the comparison. Ours show 12, 14 and 16 ft for every listed size, and we size the height so every level of racking you plan fits.
We set the height from the racking plan, not the other way round. Your racking and your material handling equipment set the number, and we design the building to it. Tell us the racking you plan and your quote is built around it, with every level accounted for.
The equipment sizes the footprint
The forklift decides more about this building than the floor plan does. Its mast height when fully raised, not the height of the load on the floor, is the number that governs the clear height you need. Reach trucks, order pickers and standard counterbalance forklifts all want different things.
Aisle width follows from the same decision, and aisle width is what determines how much of your floor is storage and how much is circulation. A narrower-aisle truck costs more and buys you back floor area every year it operates.
Docks are a site decision before they are a building decision
Whether you load at grade or at dock height changes the site, the approach, and often the foundation — a dock means either building up or digging in, and both are earthwork rather than steel.
Tell us whether you load at grade or at dock height, and we design the door openings and the drawings around it, ready for your site contractor.
Tell us about the truck approach too: what has to reach the doors, from which direction, and whether it needs to turn around once it is there. We place the doors to suit.
Pick the shape for the operation
Clear span is what lets racking and aisles run without a column. If the operation works across a narrower building, a longer one gives you the floor in a different shape: a 50 × 100 is 200 square feet more than a 60 × 80 for only a little more.
Buy width when the width is genuinely the requirement: when a column would break the racking layout or the aisle pattern. Otherwise buy length.
Insulation is an operating cost decision
An uninsulated warehouse is cheaper to buy and more expensive to run, and how much more depends entirely on your climate and whether the space is conditioned. It is also a condensation question in a humid climate, and we account for it when we design the envelope.
We can price it both ways on your quote, so you can compare with the numbers in hand.
Prefab, pre-engineered, metal warehouse — same building
The words move around and the product does not. A prefab warehouse building, a metal warehouse and a pre-engineered steel building all describe the same thing here: a rigid steel frame engineered for your building at your address before anything is fabricated, then delivered as a kit.
“Prefab” is the one that misleads. Nothing about it is prefabricated in the sense of a standard unit rolling off a shelf — the engineering happens first, specifically for the span, the height and the loads at your site. What is “pre” is the engineering, not the building.
The most common sizes for a warehouse
Width decides the racking and aisle pattern. Below fifty feet the aisles start dictating the layout rather than serving it; above sixty a forklift has room to work either side of a run.
| Size | Square feet | Starting price |
|---|---|---|
| 60 × 100 | 6,000 | $92,400 |
| 80 × 100 | 8,000 | $120,800 |
| 100 × 100 | 10,000 | $148,500 |
| 100 × 150 | 15,000 | $219,000 |
Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: Specified from the racking plan and the forklift's mast height when raised, not from the height of a load sitting on the floor.
Building kit only, freight included. Foundation, erection, site work, docks, racking and any interior work are separate. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Related guides
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
- Should you wait for steel prices to drop?Steel has been rising. Why locking your price at order beats betting on the market.
- Metal building with an overhead craneThe crane is part of the frame, not an accessory. Six things about the crane that decide the building, why hook height sets the eave, and top-running, underhung or gantry.
- What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.