Two scopes, drawn clearly
Ours: the engineered steel building — frame, sheeting, trim, framed openings, stamped drawings sealed in your state — and, quoted as its own line, blanket insulation with a vapor-barrier facing installed behind the sheeting. We do not supply insulated metal panels; our insulation is separate from the skin of the building, which is why it appears separately on the quote.
The cold-side contractor's: the refrigeration plant, the insulated room or rooms, the cold-rated doors, the floor under a freezer, the controls and the monitoring. That is a system designed to hold a temperature, and it is specified by people who do that for a living, to your product and your operation.
We supply a weather-tight, insulated steel building. We do not supply a cold envelope, and no part of our quote should be read as one.
Whole building cold, or a cold room inside a warm one
The most common arrangement is a room within a room: our shell keeps the weather out and carries the roof, and the refrigeration contractor builds an insulated box inside it for the part that has to be cold, with dock and dry storage around it at ambient. It keeps the cold system small, it keeps our building ordinary, and it lets the cold room grow or move later without touching the structure.
Where the whole building has to be cold, the insulated system is built against our frame instead, and we engineer the two to work together — bring your refrigeration contractor's requirements to the quote, or put us in touch, and we size the steel around them.
Anything that hangs from the frame belongs on the drawing
Evaporators, piping, suspended ceilings over a cold room, conveyors: if the cold-side design hangs anything from our structure, we engineer the structure for it. Tell us on the form and it goes on the drawing. The same applies to roof penetrations for refrigerant lines and to any mechanical platform on the roof.
The floor is the specialist's
A freezer floor is a specialist concrete design — it has to stay dry, stay level and not freeze the ground under it — and it belongs with the refrigeration and concrete contractors, not with the building kit. A cooler at above-freezing temperatures is a simpler slab. Either way the floor is by others, and your drawings include the anchor bolt patterns and reaction plans the concrete contractor works from.
Height, doors and dock
We size the height from the racking and the forklift's mast when raised, the same way we would a warehouse, and allow for the cold room's own ceiling and insulation. Dock doors are framed openings we engineer into the walls, the dock apron is site work by others, and the insulated doors on the cold room itself are the cold-side contractor's.
Why the insulation is a separate line
Because the right amount and the right facing depend on the building — what is stored, whether the whole shell or a room inside it is cold, and what the refrigeration design asks of the envelope. Pricing it per building, as its own line, means you see what it costs and can change it without the kit price moving. It also means nobody mistakes a blanket-insulated shell for a finished cold store.
The most common sizes for a cold storage building
Thirty feet holds a single cooler room with a dry aisle beside it. Fifty is where a room-within-a-room layout works — cold box in the middle, dock and dry storage around it — and a forklift has an aisle either side. Sixty and above is a racked cold warehouse.
| Size | Square feet | Starting price |
|---|---|---|
| 50 × 80 | 4,000 | $65,000 |
| 50 × 100 | 5,000 | $80,250 |
| 60 × 100 | 6,000 | $92,400 |
| 80 × 100 | 8,000 | $120,800 |
Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: Set from the racking and the forklift's mast when raised, as for any warehouse — with room inside that height for the cold room contractor's own ceiling and insulation.
Building kit only; blanket insulation with vapor barrier is quoted as a separate line. Slab, erection, refrigeration, the insulated room, cold-rated doors and the freezer floor are by others. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Related guides
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
- What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.
- Steel building foundationsNot part of the kit, and your drawings set it up. Why a rigid frame needs footings rather than a plain slab, the four shapes it takes, and the sequence from drawings to slab.
- How to compare steel building quotesSeven questions that make two quotes comparable, what a non-answer sounds like, and our answers to all seven.