What you are buying from us, plainly
- Engineered primary frame
- Secondary framing — purlins and girts
- Roof and wall panels, trim, fasteners
- Framed openings for doors and windows
- Stamped drawings sealed in your state, anchor bolt patterns, reaction plans
- Concrete, foundation, site work
- Erection labor
- Interior framing, drywall, flooring, ceilings
- Plumbing, electrical, HVAC
- Kitchen, bathrooms, fixtures, finishes
- Windows and the doors themselves
That is the shape of the product: a shell engineered for your address, with every framed opening placed where your floor plan puts it, ready for your trades to finish.
The shell, priced on its own
Our quote covers the steel shell of your barndominium — frame, panels, trim, framed openings and stamped drawings. The interior build-out — the trades, the finishes, the systems — is by others and is priced by them.
Because the shell is priced on its own, you get a clear number for the structure to plan the rest of the project around. The finish-out depends on how you finish it and what labor costs where you are, and your general contractor prices that side. The steel is the part we make simple.
What we engineer around your floor plan
A shell that will become a home is engineered differently from a storage building, and we work these into the frame with you when we quote:
- Where every window and door goes. Each one is a framed opening engineered into the wall, placed where your plan puts it.
- Whether there is a second floor or loft. That is real load on the frame, and we design it in.
- Eave height. Ceiling height, insulation depth, and the space services run through all come out of it.
- Whether part of it stays a shop. Many of these are half living space, half working space, and the two halves get built differently.
Bring a floor plan, even a rough one on paper. It is far more useful to us than a building size.
The most common sizes for a barndominium shell
Thirty feet of depth gives you a single row of rooms off a hallway, which is the shape of a great many houses and the least expensive way to get one. Forty is where rooms fit on both sides of that hallway. Fifty and up is where a shop half and a living half stop competing for room.
| Size | Square feet | Starting price |
|---|---|---|
| 30 × 60 | 1,800 | $31,950 |
| 40 × 60 | 2,400 | $40,920 |
| 40 × 80 | 3,200 | $52,320 |
| 50 × 100 | 5,000 | $80,250 |
Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: Ceiling height, insulation depth, and the space services run through all come out of the eave height. A loft or second floor is real load on the frame, and we design it in when you tell us about it.
Shell only — the finish-out is by others. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Steel frame or post-frame barndominium?
Many barndominiums are built post-frame, on wood posts buried in the soil. Under a home, that is where rot and subterranean termites start, and once the holes are backfilled nobody can inspect them. Wood frame is also the least fire-resistive construction class insurers use, and you pay for that class every year you insure the house.
A Stonebolt shell is a steel frame on anchor bolts in your foundation, with nothing structural in the ground — engineered for your address and sealed by an engineer licensed in your state. Steel building vs pole barn, with sources →
Permitting and financing a steel-framed residence
Your shell comes with drawings stamped for your state and engineered to your county's requirements, ready for your permit submission — with the anchor bolt patterns and reaction plans your foundation contractor works from.
If your lender wants detail on the structure, the drawings and the quote set out exactly what the shell is, so you have the documentation in hand. We'll go over it with you on the call.
Related guides
- Waiting on your land? Order your building nowLock your price and finish the design while your land closes; the engineering follows the day your address is set.
- Waiting on financing? Lock your price nowOrder to lock your building's price while your loan comes through, and have the design and engineering done by the time it closes.
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
- What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.
- Steel building foundationsNot part of the kit, and your drawings set it up. Why a rigid frame needs footings rather than a plain slab, the four shapes it takes, and the sequence from drawings to slab.


