31 Questions

Questions, answered straight

These are not questions we invented. They are the ones buyers bring to us about price, deposits, drawings, permits, and freight — answered in full, so you can fill out the quote form with the facts already in hand.

Price

What a building costs, what moves the number, and what the number does not cover.

How much does a steel building kit cost?

A 30 × 40 kit starts around $24,000 and prices climb from there with width, square footage, eave height, and the loads your site has to be engineered for. We build any size to order and publish a starting price for the twenty-one sizes we are asked for most often, rather than making you hand over your phone number to find out whether you are in the right neighborhood.

A starting price is not a quote. It is where a building of that size begins before we know your address, your eave height, and what you are putting in it. The quote comes from those specifics.

Published prices and the eight things that move the price →

Why is your price different from a quote I already have?

Almost always because the two numbers cover different things. Steel building quotes are unusually hard to compare, because one company's building includes framed openings, freight, and stamped drawings, and another company's building includes the steel and nothing else.

Our quote answers six questions in writing, line by line: whether the engineered drawings are included and sealed in your state, whether freight to your site is in the number, whether the doors and windows are in it or only the framed openings, whether insulation is in it, whether trim is in it, and what can change the price after you sign.

Freight and stamped drawings are inside our number, not added to it, and the price is locked at order. Send us the size from the other quote and we will price the same building arriving at the same address, so you are comparing like with like.

Exactly what our number includes and excludes →

Can the price change after I place my order?

No. The price on your quote is locked at order and does not move after you pay the deposit. Steel moves and the design loads for your specific site are worked through at the engineering stage, and that is our side of the job, not a change to your number.

Our terms are stated in writing on your quote, before any payment, in language you can hold us to. We will walk you through them line by line on the call if you want.

That is the whole answer, and it is the same on every quote we send.

Should you wait for steel prices to drop? →

How long is my quoted price good for?

Fourteen days, at the steel market as it stands on the day we quote it.

That is deliberately short, and it is the honest way round. Steel is a commodity and it moves. A company holding a price for six months is either padding the number to cover the movement or intending to come back to you later — and coming back later is exactly the complaint people write about afterward. A fourteen-day quote lets us give you the real number now.

If your quote lapses we requote at the market as it stands then, which can go down as easily as up.

What is not in the price?

Concrete and foundation work, erection labor, permits and jurisdiction fees, site work, off-load equipment, and financing. Doors, windows, and insulation are quoted separately so you can see what they cost rather than discovering them inside a bundled number.

Freight is not on that list. Delivery to your site is included in the price. Off-loading at your site is by others, and we confirm the equipment it needs well before delivery day.

The foundation is by others too. Your drawings include the reaction plans and anchor bolt patterns your concrete contractor builds it from, so that part of the project starts from our paperwork.

The full included and not-included list →

Do you offer financing?

No. Stonebolt does not offer, arrange, broker, or refer financing, and we do not take a cut from anyone who does. We sell building kits.

Buyers do finance these projects, usually through their own bank, a credit union, or an equipment lender. Your lender will generally want the quote and the engineered drawings, both of which you will have.

Waiting on financing? Lock your price now →

Ordering and what happens next

The part of the process where buyers most often tell us they got left in the dark.

How much is the deposit?

35% of the kit cost at order. The balance is split in two: another 32.5% when you give us the final fabrication approval, and the final 32.5% at delivery. All three figures are on your quote, and you will have read that document before you are asked for anything.

That is the standard structure for this product — a building kit is manufactured to your dimensions and your site's loads, so it cannot be resold to the next buyer, and engineering and steel procurement begin against your order. Every manufacturer in this category takes a substantial deposit for the same reason. Most of them will not tell you the number until you are on the phone with a salesperson.

What the schedule does is let you finish the design before more of your money moves: your deposit covers engineering and your approvals — door openings, colors and the rest — and the second payment is due only when you are ready for your building to go into final fabrication. The schedule is written on your quote.

What are your payment terms?

Three payments: 35% of the kit cost at order, 32.5% when you give us the final fabrication approval, and 32.5% at delivery. The figures and the schedule are written on your quote, and you will have read that document before you are asked for anything.

The price on that quote is the price. It does not move after you pay the deposit. That sounds like a low bar. It is the bar a great many people in this industry fail to clear, which is why we are stating it as policy rather than as a courtesy.

The payment schedule and the price lock are both written on your quote, where you can point at them.

Will someone still answer me after I have paid?

Yes, and we treat that as the actual product. When we read through what customers say about steel building companies, the angriest reviews are almost never about the steel. They are about a salesperson who was reachable three times a day until the deposit cleared and unreachable afterward. The happiest reviews are the mirror image: someone answered.

Your quote carries the name and direct contact details of the person responsible for your order, and that person does not change hands the moment you pay. If you cannot reach them, you escalate, and we will tell you how on the same document.

Is my deposit refundable if I cancel?

You have 72 hours from signing to cancel and have your deposit returned in full. If the law where your building is going gives you a longer cancellation period, the longer period applies — we will not use a shorter window than your state gives you. After that, the deposit is not refundable, and the same is true of the second payment once you have given final fabrication approval.

We publish the number of hours so the rule is plain from the start. You will know it before you pay, and it will be on the document in front of you.

We go through the quote with you line by line on the call: the dimensions, the eave height, and every framed opening, against what you asked for. If anything needs adjusting, tell us and we sort it with you before anything goes into fabrication.

Can I get an itemized quote instead of one number?

Yes. Every quote we send is itemized. A single bottom-line figure is hard to check and hard to compare, and an itemized one shows you exactly what you are getting — the doors, the framed openings, the drawings, and the delivery.

Ours states what the building is, what is in the package, and what you are buying separately. Freight is inside the price rather than sitting on it as a line you have to check.

Do I have to talk to a salesperson to get a price?

Not to get a starting price — that is published on this site for every size on our price list, and you can read it without giving us anything.

To get an actual quote, yes, because a real quote needs your address, your dimensions, your eave height, and what is going inside. Tell us those on the form and your quote is built around them.

Published prices, no form →

Drawings and permits

What comes on your sealed drawings, and how they fit your permit submission.

Are stamped engineered drawings included in the price?

Yes. Every Stonebolt building ships with structural drawings sealed by a professional engineer licensed in the state the building is going to, along with anchor bolt patterns and reaction plans. That is in the base price. There is no separate engineering fee and no upgrade tier that unlocks a stamp.

That means your drawings come stamped for your state and engineered to your site's local requirements, ready for your permit submission, with nothing extra to add to the price.

What is on the drawings →

Do I need a permit before I order a metal building?

No. You order first, then get your permit. Your building department issues the permit against stamped drawings for your exact building, and those are engineered after you order and approve your design.

After you order, we take you through the design phase: every door and window placed to the exact inch where you want it, and your wall, trim and roof colors. Once you approve the design, we contact your building department to confirm the wind, snow, seismic, live, dead and collateral loads for your site, engineer the building to them, and send you blueprints stamped in your state with anchor bolt patterns and reaction plans. That is what your permit application needs.

Your deposit covers that engineering and approval work, and your price is locked at order.

How to get a permit, step by step →

Do you pull the permit for me?

You or your contractor file the permit with your building department. We do the building side: we confirm your codes and loads with your building department, engineer the building to them, and provide the stamped blueprints, anchor bolt patterns and reaction plans your application needs.

Who designs the foundation?

Your engineer or your concrete contractor, using our reaction plans and anchor bolt patterns. We tell your side of the project exactly what the building puts into the ground, and where. We do not design or pour foundations.

The reaction plan is the document that matters here, and it is included, so your foundation is designed from what this building actually puts into the ground.

The building itself

Framing, specification, openings, and insulation.

Is it red iron or C-channel? How do I know which one I am actually getting?

You know by reading the quote, because ours names the framing system on it. Red iron is made from hot-rolled steel, cut from plate and welded up into an I-beam. C-channel is made from cold-rolled steel, formed into channels and then bolted back to back, web against web, to make the I-beam. Both are engineered systems and both clear span; they are simply made from different material and put together a different way, and we supply both.

Neither is the budget version. They suit different buildings, and we will help you choose the one that fits yours when we quote it.

Our quotes state the framing system explicitly, so the frame you approve is the frame that ships.

Hot-rolled iron and cold-rolled steel, side by side →

What sizes do you make?

Any size, built to order — larger or smaller than anything on our price list. The twenty-one on the price list are simply the ones we are asked for most often, which is why those are the ones with published prices. If the building you need is not on it, give us the width, length and eave height and we will quote it.

If you know what the building is for but not what size it needs to be, tell us the use and the largest thing going inside, and we size the width around it — the width sets almost everything else.

Every use, with the sizes that suit it →

What does the warranty cover?

Sixty years, structural. The number is the part everyone advertises and the least useful part of the answer — what matters is the document: what is covered, what is excluded, what voids it, and who honors it.

Ask for the full warranty document with your quote, so you can read exactly what it covers in writing.

Can I add doors and windows later?

Yes. Framed openings are engineered into the building, and we place them with you when we quote, so they are on the drawings. The doors and windows themselves can be bought and installed later, from us or from anyone.

Tell us roughly where you want doors and windows on the form and we size and place the framed openings around it. We go over the details with you on the call before the drawings are produced, so the openings suit the way you will use the building.

Can it be insulated?

Yes, and how you insulate depends on what the building is for. A workshop you heat in January is a different specification from a machinery shed that just needs to stop condensation dripping on equipment.

Insulation is quoted separately rather than bundled, so you can see what it costs and decide.

Delivery and freight

What arrives, when, and what has to be waiting for it.

Is freight included?

Yes. Delivery to your site is included in the price of the building. There is no freight line, no fuel surcharge, and no distance adjustment arriving later in the process.

Freight on a building crossing several states is a real cost, and we carry it inside the price rather than adding it on. Undisclosed freight is one of the most consistent complaints in this category, and our answer to it is not disclosing it better. It is not charging it separately at all.

Alaska and Hawaii work differently. We deliver to a port of your choosing, included in the price. The ocean leg and the run from the port to your site are by others.

How long from order to delivery?

Two to five months. Where you land in that range comes down to two things: the time of year, because spring and summer are busier, and the size of the building, because a larger one takes longer to fabricate.

Your quote states the lead time we are actually working to, in writing, so the timeline you plan around is the one on the document rather than one from a conversation.

If something slips, you will hear it from us before you notice it yourself.

Who unloads the truck?

Off-loading is by others. Your building arrives on a flatbed and someone at your site needs equipment capable of getting several tons of steel off it — typically a forklift with real capacity, a telehandler, or a crane, depending on the building.

We tell you what is required well before delivery day, and we go over it with you on the call. If your site cannot take a full-size truck, tell us on the form and we take it into account when we quote.

What if parts are missing or damaged when it arrives?

Inspect and note it on the delivery paperwork before the driver leaves. A shortage or damage noted at delivery is a straightforward claim, and the paperwork is what makes it one.

Then call us. Missing and damaged parts happen in freight, on every kind of building, from every manufacturer. What you are entitled to judge a company on is what happens in the following week, not whether it ever happens.

Where are the buildings manufactured?

Manufactured in the USA from American steel.

Putting it up

We sell the kit. Here is who does the rest, and how to find them.

Do you erect the building?

No. Stonebolt supplies engineered building kits. We do not provide concrete, foundation work, erection labor, or financing, and we do not have a crew we send out.

Erection is by others — you, a local erector, or your general contractor — and they build from the engineered drawings that come with your kit.

Can I put it up myself?

Yes. Every part is cut and pre-drilled, the building bolts together with no welding, and it comes with the drawings to put it up. Many of our buyers erect their buildings themselves.

Tell us on the form that you plan to erect it yourself, and we set the delivery date around your crew.

Can you put up a metal building yourself? →

How do I find a crew?

Ask for erectors who have put up this type of frame specifically, ask for two recent jobs you can go look at, and check that they carry their own insurance. A general contractor who has never erected a metal building can do it, but it will not be fast.

Your quote states the lead time, which gives you a clear delivery window to book a crew around, so they can start soon after the steel arrives.

About Stonebolt

Who you are dealing with, and what we will not claim.

Do you ship to my state?

All fifty, with drawings sealed by an engineer licensed in the state the building is going to, and delivery to your site included in the price.

Alaska and Hawaii are the one exception to the delivery part. There we deliver to a port of your choosing, and the ocean leg and the run to your site are yours to arrange.

What changes state by state →

What is the catch?

There is no catch. We sell an engineered building kit, not a finished building: sealed drawings for your state, the steel, and delivery to your site, with every line written on the quote.

Slab, erection, and site work are by others — a general contractor, a local erector, or you. We are who your general contractor buys the building from.

Still have a question?

Ask it on the quote form. You will get an answer from a person, and a starting price straight away whether or not you go any further with us.