Learn

Can you put up a metal building yourself?

Yes. A Stonebolt building kit is made for it: every part is cut and pre-drilled, the building bolts together, and it comes with the drawings to put it up. Many of our buyers erect their buildings themselves.

There is no welding and no cutting on site. The frames, the girts and purlins, the panels and the trim arrive cut to length with every hole drilled, and the whole building goes together with bolts and fasteners.

What it takes is a foundation built to your anchor bolt pattern, the right lifting equipment for the frames, and a few capable helpers on the days the frames go up.

A red iron steel frame standing on a finished concrete slab in Texas, rafters and purlins up but no panels yet, remaining members stacked beside it
A frame going up on its slab in Texas, before the panels go on.

What comes with your kit

Pre-cut, pre-drilled steel

Frames, girts, purlins, panels and trim, cut to length with every hole drilled before it ships.

Bolt-together connections

No welding on site. The building goes together with bolts and fasteners.

The drawings to put it up

Your stamped blueprints show how every piece of your building goes together.

Anchor bolt pattern and reaction plans

Your foundation is built to match the building before the steel arrives.

Delivered to your site

Freight is included, and we set the delivery date around your crew.

Doors and windows where you want them

Placed to the exact inch in the design phase, with framed openings ready for them.

How a do-it-yourself build goes

The same order every building goes up in.

  1. 01

    Order and design

    Your building is designed to the inch and engineered for your site, and you receive your stamped blueprints.

  2. 02

    Foundation to the anchor bolt pattern

    Your slab and footings are poured with the anchor bolts set exactly where your drawings show.

  3. 03

    Delivery

    Count the shipment against the packing list on delivery day, and stack it where your crew can reach it.

  4. 04

    Frames up

    The main frames are stood up and braced, following your drawings.

  5. 05

    Girts and purlins

    The secondary framing goes on between the frames.

  6. 06

    Panels, trim, doors and windows

    The roof and wall panels, the trim, and your doors and windows finish the building.

What you will want on site

Lifting equipment

A rented lift or telehandler for setting the frames and working at height.

A few capable helpers

Extra hands on the days the frames go up; panels and trim go faster with a crew.

Tools and fall protection

Impact drivers and hand tools for the bolts and fasteners, and harnesses for work on the frames.

A laydown area

A clear, level spot near the slab where the steel is stacked by piece.

Who does what

The building

  • Pre-cut, pre-drilled steel for the whole building
  • Stamped blueprints that show how it goes together
  • Anchor bolt patterns and reaction plans
  • Delivery scheduled around your crew

You and your helpers

  • The foundation, built to the anchor bolt pattern
  • Unloading and lifting equipment
  • Putting the building up

Some owners put up the whole building themselves; others hire a crew for the frames and finish the panels and trim on their own. The kit is the same either way.

Exactly what the kit includes →

What to tell us before a quote

Tell us you plan to put it up yourself, and we plan your delivery around it.

  • 1Where the building is going
  • 2Width, length and eave height, or what has to fit inside
  • 3That you plan to erect it yourself, and roughly when
  • 4The lifting equipment you have or plan to rent

Questions people ask

Can I build a metal building myself?

Yes. A Stonebolt kit is cut and pre-drilled, bolts together with no welding, and comes with the drawings to put it up. Many of our buyers erect their buildings themselves.

Do metal building kits come with instructions?

Your kit comes with stamped blueprints that show how every piece of your building goes together, plus the anchor bolt pattern your foundation is built to.

What equipment do I need to put up a steel building?

A rented lift or telehandler for the frames, impact drivers and hand tools for the bolts and fasteners, and harnesses for work on the frames.

Can I hire help for part of it?

Yes. Some owners hire a crew to stand the frames and then finish the panels, trim, doors and windows themselves.

Is welding required to put up a metal building?

No. A Stonebolt building bolts together; every piece arrives cut to length with its holes drilled.

Why there are no numbers on this page

No crew sizes, hours, torque values or lifting procedures. Those depend on your building and are on the drawings that ship with it.

Ready to price your building?

Most Stonebolt projects start around $24,000 and run from 30 × 40 up. If that fits your budget, we'd like to hear about your project.