What erection is, and who owns it
Erection is assembling the delivered kit into a standing building: setting the frames, bracing them, hanging the secondary framing, then sheeting the roof and walls and fitting the trim and openings. It is real construction work at height with heavy steel.
It is by others, along with the concrete and the site work — that is how a kit works, and your drawings give the erector what they build from. What is and is not in the kit →
The sequence, and what each step protects
01
Drawings, then foundation
The anchor bolt pattern and reaction plan come from us after the order. Your foundation contractor builds to them, so the slab is poured to match your building exactly.
02
Bolts set, and checked
Anchor bolts are set while the concrete is wet and verified before the steel arrives. The anchor bolt pattern on your drawings shows exactly where each one goes, so the frames land on them cleanly.
03
Access and laydown agreed
A truck has to reach the site and something has to unload it. Where the steel is stacked decides how far every piece gets carried, so the laydown area is set out ahead of delivery day.
04
Delivery, and the count
Check the shipment against the packing list before anyone signs and before the truck leaves. Missing or damaged parts noted on day one are an ordinary phone call to us, and the paperwork makes the claim straightforward.
05
Frames up, then skin
Primary frames, bracing, secondary framing, then sheeting and trim. The bracing goes in with the frames, and the building is stable once it is.
Steps 01 and 02 both happen before a single piece of steel arrives, and both are built from the drawings that come with your kit. The foundation handoff in detail →
Can you erect it yourself? Yes.
Your kit is made for it. Every part is cut to length and pre-drilled, the building bolts together with no welding on site, and the drawings that ship with your building show how every piece goes together. Many of our buyers erect their buildings themselves.
What you will want on hand is lifting equipment for the frames, a few capable helpers on the days the frames go up, and a schedule that suits your season. Tell us on the form that you plan to erect it yourself and we set the delivery date around your crew.
Some owners erect the whole kit themselves; others hire a crew for the frames and finish the sheeting and trim on their own. The kit is the same either way.
Can you put up a metal building yourself? What comes in the kit →
Judging an erector
Ask these, and listen for specifics rather than reassurance.
- Have you erected this manufacturer's system before? Systems differ in their connection details, and familiarity shows up in the schedule.
- What insurance do you carry, and can I see the certificate? Work at height with steel is exactly the situation this exists for.
- Who unloads the truck, and what equipment is that assuming is on site?
- What is the plan if a part is missing or damaged — who calls whom, and does the crew stand down or work around it?
- Is the quote for the shell only, or does it include the doors, the trim and the openings?
- What weather stops you, and what happens to my dates when it does?
The same principle as comparing building quotes applies here: two erection prices are only comparable once you know they cover the same scope. How to compare quotes →
One thing we will not do on this page
Give you erection instructions. No lifting procedures, no bracing sequences, no torque figures. Those belong in the drawings that ship with your building and in the hands of someone who has done it before — not on a page written for a general reader who might be standing on a frame while they read it.