The office end is occupied space
People sit in it all day, so the building department treats it differently from the bay behind it: egress, accessibility, insulation, ventilation, the ceiling height a finished room needs once ducts and lighting run below the frame. None of that is unusual. Tell us how the office will be used and we set the eave and the openings on that end around it, with drawings stamped for your state.
The shell for the office end is the same engineered steel as the shop end. We frame it for the interior you have in mind — walls, ceilings, HVAC, electrical, plumbing, floor finishes, glazing — so the trades who finish it start with a building that is ready for them.
Two kinds of space, one frame. Tell us about the office on the form and we engineer the office end and the shop end together.
One frame, two ceiling heights
The shop end sets the eave: the door the tallest thing drives through, the lift, the racking. The office does not want that height — it wants a finished ceiling at a normal room height with services above it. The usual answers are a dropped ceiling in the office end, which leaves the frame alone, or a mezzanine that puts a second office floor over the first and turns the extra height into usable space.
A mezzanine is real load on the frame and the slab, and we design it in with the rest of the building. If the office might go to two levels, mention it and we'll go over it on the call.
Windows, doors and the front are framed openings
An office front is mostly glass and entry doors, and every one of those is a framed opening in the steel that we engineer in — like the overhead door on the shop end. Tell us about the front elevation and we frame it to match: where the entrance sits, how much glazing, whether the office is full-width across the end or a corner of it.
The glazing, the storefront system and the doors themselves are supplied and installed by other trades. The kit provides the openings they fit into, sized to what you tell us.
A shell finished entirely as offices
The same building works with no shop end at all — a steel shell finished as professional or administrative offices. Clear span means the interior can be partitioned any way you like and re-partitioned later. We work through the same points above with you, applied to the whole floor: ceiling height, openings, a possible second level, and how the interior will be finished. The commercial page covers the permitting side in more depth.
Site, parking and approvals
An occupied building brings site requirements with it — parking, accessible routes, utilities to the office end — that a storage building does not. Site work is by your site contractor. Your drawings come stamped for your state and engineered to your county's requirements, ready for your permit submission and the plan reviewer.
The most common sizes for an office building
Thirty feet is an office end on a single-bay shop. Forty gives the office a reception and rooms either side of a corridor with a working bay behind. Fifty and above is where a yard or warehouse operation and a full office front share one roof comfortably.
| Size | Square feet | Starting price |
|---|---|---|
| 40 × 60 | 2,400 | $40,920 |
| 40 × 80 | 3,200 | $52,320 |
| 50 × 80 | 4,000 | $65,000 |
| 50 × 100 | 5,000 | $80,250 |
Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: The shop end sets the eave; the office wants a finished ceiling well below it, by a dropped ceiling or a mezzanine. A mezzanine is load on the frame and the slab, and we design it in with you.
Building kit only. Slab, erection, glazing, interior walls, ceilings, HVAC, electrical and plumbing are by others. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Related guides
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
- What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.
- How to compare steel building quotesSeven questions that make two quotes comparable, what a non-answer sounds like, and our answers to all seven.
- Steel building foundationsNot part of the kit, and your drawings set it up. Why a rigid frame needs footings rather than a plain slab, the four shapes it takes, and the sequence from drawings to slab.