Steel building foundations
Not part of the building kit — anyone's — and built from the drawings that come with yours. Here is what we supply, what your contractor does, and the order it happens in.
A steel building kit does not include a foundation. That is true of every manufacturer in this category, not just us, and it is why every Stonebolt kit comes with the documents your foundation is designed from.
It is also the part where the two halves of the project have to talk to each other. We engineer a building; a local contractor pours something for it to stand on. Our sealed drawings are what connect those two sentences, and they come with every order.
What we supply
- Stamped structural drawings, sealed in your state
- The reaction plan — what the building puts into the ground, and where
- The anchor bolt pattern — exactly where the bolts go
What we do not
- Design the foundation
- Pour concrete or set anchor bolts
- Do site work, excavation or drainage
- Pull your permit
Why it is not just a slab
A rigid steel frame does not only press down. At the base of each column it also pushes outward, and it concentrates what it carries into a handful of points rather than spreading it evenly along a wall. That is the whole reason a foundation for one of these is a different job from a garage slab, and the reason your concrete contractor needs a document rather than a footprint.
The reaction plan is that document. It states, column by column, what the building delivers into the ground and in which direction. Everything below — which shape of foundation you end up with, how big the footings are, what ties the column bases together — is your engineer's answer to those numbers.
The four shapes it usually takes
Which one you get is decided by the reactions, your soil, your frost depth and what the floor has to carry — not by preference, and not by us.
Slab on grade with a thickened edge
The floor and the perimeter support are effectively one piece of concrete, deeper around the outside where the columns land. Common on smaller buildings and the closest thing to what most people picture when they say “slab.”
Perimeter footings with a separate floor slab
The frame bears on footings running around the building, and the floor is poured as its own slab afterward. More usual as buildings get larger, and the normal answer when the floor itself has to carry something heavy.
Isolated piers under each column
Each column sits on its own footing, sized for what that particular column delivers, often tied together by grade beams. This is where the reaction plan earns its keep, because the columns are not all doing the same amount of work.
Deep foundations
Piles or drilled shafts, when the soil near the surface will not carry the building. Uncommon, and identified by a geotechnical report well before anything is poured.
A “footing” in all four is the same idea: the part that spreads a concentrated load out over enough ground to carry it. Poor soil means a wider footing for the same building, which is why two identical buildings on two sites can have genuinely different foundation quotes — and why your contractor prices it from your reaction plan and your ground.
The order it has to happen in
Each step produces something the next one needs, and your sealed drawings are the first of them. Here is the order, and who handles each part of it.
- 01
You get a quote and place an order
The starting price you were shown is based on the building's size; your quote is built around your site, from what you tell us on the form.
- 02
We engineer the building and produce drawings
Sealed by an engineer licensed in your state, and they include the two documents your foundation depends on: the reaction plan and the anchor bolt pattern.
- 03
Your engineer designs the foundation from those drawings
This is the handoff. The reaction plan says what the building puts into the ground and where; the foundation is designed to carry it, from your building's actual reactions.
- 04
You permit, then pour
Some jurisdictions issue a foundation-only permit first. Your sealed drawings are ready for your permit submission at whichever step your jurisdiction asks for them.
- 05
The concrete cures
Concrete gains strength over time, and your engineer will tell you what has to be true before anyone sets steel on it. That cure time is planned into the schedule alongside your delivery date.
- 06
The building arrives and goes up
By the time the truck reaches your site, the slab is finished, cured, and the anchor bolts are exactly where the drawings say, ready for the frames.
Three things your drawings take care of
The foundation is quoted from the reaction plan
A concrete contractor asked to price a slab for “a 50 × 100 steel building” is working from a footprint. Your sealed drawings include the reaction plan, so your contractor quotes the foundation from what the building actually carries.
The anchor bolts match the pattern
Anchor bolts are cast into wet concrete and they match the pattern in the drawings. Your anchor bolt pattern shows exactly where each one goes, and the template is checked against it before the concrete goes in.
The slab is ready when the truck arrives
Freight is scheduled, and the delivery date is set with you. If the concrete is running late, tell us before delivery is booked and we will work the date out with you.
What to ask your concrete contractor
Six questions that make the conversation useful. A metal building foundation is a different job from a garage slab, and a contractor who has done one before will say so plainly.
- 1Have you built a pre-engineered metal building foundation before?
- 2Does this quote assume you have seen my reaction plan and anchor bolt pattern?
- 3Who sets and checks the anchor bolts — you, or someone else?
- 4What does the site need to look like before you can start?
- 5How long between the pour and the day steel can be set on it?
- 6What is excluded — excavation, fill, drainage, rebar, testing?
Why there are no numbers on this page
No slab thicknesses, no footing depths, no reinforcement schedules. Those are your engineer's output for your ground, your building and your jurisdiction, and a figure published on a manufacturer's website is no substitute for that.
What we can tell you is what the building puts into the ground and where, precisely, in a sealed document that comes with every order. That is the input your engineer needs, and it is included rather than sold as an upgrade.