Request a quote

A few short questions. We ask about size, use and timing because that is what your steel building quote is built around — answer what you know, and we'll go over the rest with you on the call.

Price any size3D view

Published prices, not a teaser — the same numbers as our pricing page. Required

Where it's going first — the same county loads our engineers price against. Then your starting price appears here. No name, no phone number.

Drawing updates as you type
Stamped drawings includedFreight includedPrice locked at order

Stonebolt supplies building kits. Concrete, foundation work, erection labor and permits are by others. We don't offer or arrange financing.

The process

How a Stonebolt building gets built

  1. A line drawing of a steel building with a roll-up door, width and height marked with red dimension arrows, sitting on an outlined slab

    Tell us about it

    Location, dimensions, what it's for. A few minutes.

  2. A line drawing of an itemized quote sheet with a red check mark, standing behind a flatbed truck loaded with red steel

    We quote it

    Itemized, delivery included, good for 14 days — not “to be determined.”

  3. A line drawing of a stack of engineered drawing sheets showing a red rigid frame in elevation, with an engineer's seal beside them

    We engineer it

    Drawings stamped by an engineer licensed in your state.

  4. A line drawing of a tapered steel plate girder on rollers under a cutting head throwing red sparks

    It is fabricated

    Two to five months, depending on season and size. Stated on your quote.

  5. A line drawing of a flatbed truck loaded with bundled red steel, a red arrow along the load showing it in motion

    We deliver it

    Scheduled date, off-load requirements confirmed in advance.