Design the shop, then give some of it away
The shop sets the building: the door the longest thing drives through, the eave height that door needs above it, the bay depth with room to work at both ends. We size those first, and the living end is a matter of how many feet of that footprint you wall off and finish — a well-sized shop gives you plenty of floor to work with.
A second floor over the living end — a loft, bedrooms above the kitchen — is real load on the frame, and we design it in with the rest of the building. If upstairs rooms might be part of the plan, mention it on the form and your quote covers it.
We size for the shop you want in ten years, and fit the living end into the footprint with you.
Is this a barndominium?
Yes — the same shell, engineered the same way, from the same price list. The word describes the intent rather than the steel. If the house is the point and the shop is really a big garage, read the barndominium shells page, which is written around living space. If the shop is the point and you want to sleep next to it, you are on the right page.
Either way the kit is the shell, and the interior — walls, plumbing, electrical, kitchen, bathrooms, finishes — is by other trades, working inside a shell we frame for the rooms you have in mind.
The living end is occupied space, and it is permitted that way
A building department treats a room somebody sleeps in differently from a bay a tractor sits in. How the shop and the living space are separated, what the living end needs for egress, insulation, ventilation and services, and whether the two halves can share a slab and a roof the way you want — all of that is decided locally, and it varies from one county to the next.
Tell us “part of this is a dwelling” on the form, and your drawings come stamped for your state and engineered to your county's requirements, with the framed openings in place, ready for your permit submission.
Where the living end goes
The usual answer is one end of the building, full width, with the shop door on the other end — which keeps the shop a clean rectangle and puts every window of the living space on three outside walls. A living section along one side works where the lot is wide and the shop is shallow. Upstairs over the shop gives the shop the whole floor and costs a designed second-floor structure.
Windows and entry doors are framed openings we engineer in, like every other opening in the building. Tell us where you want the kitchen window to look out and we frame it there.
What the kit does and does not include
The kit is everything on the What's included page — the engineered frame, sheeting, trim, fasteners, the framed openings you specify, and stamped drawings sealed in your state. It is not the slab, the erection, the interior walls, the plumbing, the wiring, the heating or the finishes. We publish that list so you can see exactly what the kit covers.
The most common sizes for a shop with living quarters
Thirty feet is one working bay with a single row of rooms at the far end. Forty gives the shop room to work beside what is parked and the living end rooms on both sides of a hallway. Fifty and up is where the shop half and the living half stop competing for the same floor.
| Size | Square feet | Starting price |
|---|---|---|
| 40 × 60 | 2,400 | $40,920 |
| 40 × 80 | 3,200 | $52,320 |
| 50 × 80 | 4,000 | $65,000 |
| 50 × 100 | 5,000 | $80,250 |
Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: The shop door sets the eave. A second floor over the living end is real load on the frame, and we design it in when you mention it on the form.
Building kit only. Slab, erection, and the interior build-out of the living end are by others. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Related guides
- Waiting on your land? Order your building nowLock your price and finish the design while your land closes; the engineering follows the day your address is set.
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
- What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.
- Steel building foundationsNot part of the kit, and your drawings set it up. Why a rigid frame needs footings rather than a plain slab, the four shapes it takes, and the sequence from drawings to slab.
- Erecting your buildingNot part of the kit. The sequence, the questions to ask an erector, and a straight answer on doing it yourself.


