Inside a steel gym building: a hardwood court with a basketball hoop, a turf strip and weight equipment under a red steel frame

Steel gym buildings

A training floor wants three things from a building: no columns, height to the lowest thing overhead, and a slab that does not mind being hit. The first two are ours. The third is poured by your concrete contractor, working from the drawings we supply with the building.

Tell us what the floor will be used for

Turf lanes, rigs, platforms, a court, classes, how many people at once, and whether anything hangs from the structure. That is enough to size the floor and the height.

Price any size

Published prices, not a teaser — the same numbers as our pricing page. Required

Where it's going first — the same county loads our engineers price against. Then your starting price appears here. No name, no phone number.

Stamped drawings includedFreight includedPrice locked at order

Stonebolt supplies building kits. Concrete, foundation work, erection labor and permits are by others. We don't offer or arrange financing.

Court buildings →

Height is measured to the lowest fitting, not the roof

Wall balls, rope climbs, a rig with a pull-up bar somebody jumps to, an overhead press on a platform: every one of them is measured against the lowest thing above the floor — a light, a heater, a duct, a fan — and not against the eave. Tell us what hangs in the building and where, and we set the eave height around it so the training floor gets the clearance it needs.

Then there is the air. A training floor is people working hard in an enclosed space, and ventilation and heating or cooling are a larger part of the design than in any storage building. That equipment lives in the same overhead space as the rigs, which is why we plan the two together.

We plan the ceiling from the floor up: what people do, what hangs, what moves air, then the eave that fits it all.

Clear span is the reason to build this way

A column in the middle of a training floor is a permanent obstacle, and a steel building spans the whole width without one. That is what lets a floor be re-planned — turf one year, platforms the next, a court marked out later — without a post deciding where the line falls. Width is bought once; use it on the span.

Dropped weights are a slab question

Loaded barbells dropped from overhead, sleds, heavy racks: the floor takes the punishment, and the floor is concrete poured by your contractor on a design that knows it is a gym. Specialist flooring goes on top of that. Slab and flooring are by others, and your drawings include the anchor bolt patterns and reaction plans your concrete contractor works from when designing a slab for “dropped weights”. Tell us on the form and we'll go over it on the call.

Rigs, ropes and anything hanging from the frame

A floor-standing rig is furniture. A rig bolted to the frame, a ceiling-mounted rope anchor, a suspended heater, a mezzanine for a second training area: those are load on the structure, and we design them into the frame. If something might hang, tell us on the form and we engineer the steel for it — your quote is built around the way the floor will actually be used.

Occupied space, permitted that way

A gym is a building full of people, and it is permitted as one: egress, accessibility, restrooms and changing rooms, parking. Your drawings come stamped for your state and engineered to your site's local requirements, ready for your permit submission. The fit-out — partitions, finishes, plumbing, mechanical, lighting — is by other trades. The commercial page covers the permitting side in more depth.

If it is a court you want

A gymnasium built around a basketball or pickleball court has a different governing dimension — the run-off around the lines — and its own page: pickleball and court buildings. A training facility with a court in it is still this page; a court with a weight room beside it is that one.

The most common sizes for a gym building

Thirty feet is a small box with equipment along one wall and a turf strip down the middle. Fifty is where rigs, platforms and a turf lane run side by side without the layout fighting itself. Sixty and above is a facility with a court or a second training area.

SizeSquare feetStarting price
50 × 804,000$65,000
50 × 1005,000$80,250
60 × 1006,000$92,400
80 × 1008,000$120,800

Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: Measured to the lowest fitting — lights, heaters, ducts, fans — not to the roof. Tell us about rope climbs, wall balls and anything bolted to the frame, and we set the eave around them.

Building kit only. Slab and specialist flooring, erection, rigs, mechanical, plumbing and the interior fit-out are by others. Starting prices, not quotes. Published prices and the eight price drivers →

Price your size and ZIP code in the estimator above →

Related guides

  • How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
  • Building an indoor sports facilityTurf fieldhouses, indoor soccer, baseball training, basketball gyms and multi-sport complexes. What the sport asks of the building, and what drives the cost to build one.
  • Ice rink constructionA clear span over the ice and an envelope that fights condensation. What the building does, what the rink contractor does.
  • What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.

All building uses →

Ready to price your building?

Most Stonebolt projects start around $24,000 and run from 30 × 40 up. If that fits your budget, we'd like to hear about your project.