A building people occupy is a different project
Storage holds things. A commercial building holds people, and that single difference changes the permit path, the drawings your jurisdiction wants, and how the building is engineered — and we build the quote around it.
We supply the same thing either way: an engineered shell with drawings sealed by an engineer licensed in your state. On a commercial project those drawings are ready for your permit submission alongside your design professional's.
If the building will be occupied, say so on the form. We engineer the shell for it and work alongside your design professional, so the structure and the rest of the drawings fit together.
What we supply, and what your side owns
The kit is the structure and the envelope: primary and secondary framing, roof and wall panels, trim, fasteners, framed openings, and stamped drawings with anchor bolt patterns and reaction plans. Freight is in the price.
On a commercial job the foundation, erection, site work, and the whole interior — partitions, finishes, mechanical, electrical, plumbing, and whatever your occupancy requires — are by others.
That is how pre-engineered metal buildings are sold, and it keeps the kit price clear: you see exactly what the structure costs, line by line, on your quote.
Clear span is worth more here than almost anywhere
A column in the middle of a warehouse is an inconvenience. A column in the middle of a showroom, a workshop floor with a production line, or a leasable unit is a permanent constraint on what the space can be used for and what a tenant will pay for it.
Clear span is the expensive dimension, and on a commercial building it is usually worth buying. Length is cheap by comparison — if you need more floor and the width already works, extending the long side is the better value every time.
Openings placed around the operation, not the elevation
Framed openings are structural. Every door and window is reinforced into the frame, so we engineer their number and position with you when we quote.
Tell us how goods, vehicles and people move through the building — where the dock is, which way the overhead doors face, where the accessible entrance goes — and we lay out the openings around it.
Stamped drawings for the commercial permit path
Commercial permitting involves more reviewers than a residential or agricultural building does, and the specific requirements vary by jurisdiction. We engineer your building to your site's local requirements, so the structural side of your submission is ready when you are.
Your drawings are the part reviewers ask for: structural drawings sealed by an engineer licensed in your state, with the reaction loads and anchor bolt layout your foundation engineer needs, ready for your permit submission.
Commercial metal building contractors, and where we fit
People search for a commercial metal building contractor expecting one company to do the whole thing. On a project this size it is usually a team, and our part in it is clear from the first quote.
We supply the engineered building and the sealed drawings. A general contractor or construction manager runs the project. A civil engineer and a foundation engineer handle the site and what the building stands on. An erection crew puts the steel up. A mechanical, electrical and plumbing contractor does the fit-out. On a smaller commercial job one firm may wear several of those hats, and we work with whichever team you have.
If your general contractor has questions about erecting a pre-engineered metal building, receiving the shipment, or matching the foundation drawings to the anchor bolts, we'll go over it with them. More on that handoff →
The most common sizes for a commercial building
Forty feet works for a single-purpose commercial space. Fifty and above is where a floor can do two things at once without a column deciding where the line falls.
| Size | Square feet | Starting price |
|---|---|---|
| 50 × 80 | 4,000 | $65,000 |
| 50 × 100 | 5,000 | $80,250 |
| 60 × 100 | 6,000 | $92,400 |
| 80 × 100 | 8,000 | $120,800 |
Prices are the same published numbers as our pricing page, kit only, delivery included. Any size can be built to order; see popular sizes and prices. Height is not in this table because it is set by what happens inside: Set by what happens inside rather than by preference — mezzanine plans, racking, or the ceiling height the finished space needs once services run below the frame.
Building kit only. Foundation, erection, site work and interior fit-out are by others. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Related guides
- How to get a permit for a metal buildingOrder first, permit second: the eight steps from your order and design to the stamped blueprints your building department asks for.
- Should you wait for steel prices to drop?Steel has been rising. Why locking your price at order beats betting on the market.
- Equipment dealership buildingsSales, service and parts under one roof. Why the service shop decides the building: machine height, doors, cranes, wash bay and room to grow.
- What a steel building actually costsThe kit is one of five costs. Our published prices, plus who quotes the other four and what to ask them.
- How to compare steel building quotesSeven questions that make two quotes comparable, what a non-answer sounds like, and our answers to all seven.


