Learn

How to compare steel building quotes

Two quotes for the same building usually cover different things, so the headline numbers rarely line up. Seven questions make them comparable, and our quote answers all seven in writing — our answers are at the bottom of each one.

When we went through what buyers actually complain about in this category, the pattern was not what we expected. Almost none of the anger is about steel. It is about a price that moved after the deposit, freight that appeared late, a quote that excluded something the buyer assumed was in it, and a deposit that vanished without an itemization.

Every one of those comes down to two quotes that could not be laid side by side. So the useful thing is not another argument about why to buy from us — it is the list of questions that makes them comparable, and a quote from us that answers every one of them in writing.

The seven questions

01

Is freight included in this price, or added later?

Undisclosed freight is one of the most common complaints in this category, and freight is a real cost — a building is a lot of steel moving a long way. A quote without freight in it is not comparable to one with freight in it.

A straight answer
A yes or a no, plus a number if it is a no. Anyone who has priced a building knows what the freight on it costs.
A non-answer
“That gets calculated later,” “it depends on the carrier,” or freight appearing as TBD on the document.

Ours

Included, and never itemized separately. Alaska and Hawaii are the one exception and we say so on the page: delivery to a port of your choosing is included, the ocean leg is yours.

What's included →

02

Are the drawings sealed by an engineer licensed in my state?

“Engineered” and “stamped by an engineer licensed where your building is going” are different claims, and only the second one is what a plan reviewer needs. A state seal is what makes the set ready for your permit submission.

A straight answer
A direct yes, and confirmation that anchor bolt patterns and reaction plans come with it — your concrete contractor needs those to quote the foundation.
A non-answer
“Professionally engineered,” “engineer-certified,” or any phrasing that describes the drawings without naming who seals them and where they are licensed.

Ours

Sealed by a professional engineer licensed in the state your building is going to, in all 50 states, included in the base price with no separate engineering fee. Anchor bolt patterns and reaction plans included.

Permit drawings →

03

What is the deposit, and when is it due?

Every manufacturer in this category takes a substantial deposit, and for a real reason — a kit is made to your dimensions and your site's loads, so it cannot be resold. The question is not whether there is one. It is whether you were told the number before you were on the phone with someone.

A straight answer
A percentage range and a balance schedule, in writing, on the quote you are reading before you are asked for anything.
A non-answer
A number that only appears once you are talking to a salesperson, or a deposit whose size you learn at signing.

Ours

35% of the kit cost at order, 32.5% when you give us the final fabrication approval, 32.5% at delivery — written on the quote you read before you are asked for anything. The price on it does not move after you pay.

The full answer →

04

If I cancel, what do I get back, and by when?

This is the second most common complaint in the category: a deposit that disappeared with no explanation and no itemization of what it had been spent on. The rule is knowable in advance, and ours is written on the quote.

A straight answer
A stated window, in hours or days, and a plain statement of what happens after it. Ask them to point at where it is written down.
A non-answer
“We handle that case by case,” or a cancellation clause you are shown for the first time at signing.

Ours

72 hours from signing to cancel and have the deposit returned in full — or longer, where the law in your state gives you longer. After that it is not refundable, and we say so before you pay rather than after.

The full answer →

05

What is on the exclusion list for this quote?

Two quotes for “the same building” routinely cover different things, and this is where the gap lives. Doors, windows, insulation, gutters and foundation engineering are all commonly assumed in and quoted out. Compare the exclusions, not the headline number.

A straight answer
A written list. If a company sells a lot of buildings, they know exactly what is not in one.
A non-answer
“Standard package,” “everything you need,” or an exclusion list you have to reconstruct by asking about items one at a time.

Ours

Published as a page, not a clause. Building kit only — concrete, erection labor and site work are by others, and the page lists everything else plainly.

Everything not included →

06

How long does this price hold?

Steel is a commodity and it moves. A quote with no expiration is not generous, it is unfinished — it means the number can be revisited, and the revisiting tends to happen in one direction.

A straight answer
A stated number of days, and an explanation of what happens after it.
A non-answer
No date on the document, or a validity period that turns out to be shorter than you were told.

Ours

14 days, at the market as it stood the day we wrote it.

How pricing works →

07

What lead time is on the contract, not on the phone?

A verbal timeline that does not match the contract is one of the most common complaints in this category, and the contract is the one that counts. If a project depends on a date, the date has to be in the document.

A straight answer
A lead time written on the quote, with a stated basis for it.
A non-answer
A fast number given verbally and a much vaguer one — or none at all — in writing.

Ours

2 to 5 months depending on season and size, with the lead time we are actually working to stated on your quote. Hold us to the document.

The full answer →

Where quotes legitimately differ

Not every cheaper quote is hiding something, and a page that implied otherwise would not be worth reading. There are real reasons two honest numbers differ, and they are all things you can evaluate:

  • Structural system — Red iron and C-channel are both engineered to your loads and both clear span. They are not the same price, and neither is simply better.
  • Panel gauge and finish — Thinner panel and a shorter-life finish cost less. That is a legitimate trade, provided you know you made it.
  • Design loads — Two quotes engineered to different assumptions about your site are not comparable at all. Ours is engineered to your address, so the steel matches your site.
  • Options — Insulation, gutters, wainscot, ventilation, colors. Easy to quote out and easy to assume in.
  • Freight distance — How far the steel travels is a real cost whether or not it appears as a line.

The difference between a legitimate saving and a problem is whether you can see it. A cheaper quote you understand is a decision, and our itemized quote is written so you can account for every line of it.

Line them up

Write these down for each quote and the comparison makes itself. Our quote fills in all nine rows in writing, so you can lay it straight alongside any other.

What to recordQuote AQuote B
Total price, delivered to site
Is freight in that number?
Deposit — percentage and due date
Cancellation window
Drawings sealed in my state?
Anchor bolts and reaction plans included?
Everything excluded, in writing
How long the price holds
Lead time, as written on the contract

Get one of the quotes

You will see a starting price before you give us a name or a phone number, and every answer above is already published rather than waiting behind a salesperson.