A gable-roof steel commercial building in Massachusetts

Metal buildings in Massachusetts

Every building we ship to Massachusetts comes with drawings sealed by an engineer licensed in Massachusetts — included in the price, not an add-on.

Price a building for your Massachusetts site

Your ZIP, your dimensions, your eave height. We work out the design loads from the address rather than the state, and you will see a starting price straight away.

Price any size

Published prices, not a teaser — the same numbers as our pricing page. Required

Where it's going first — the same county loads our engineers price against. Then your starting price appears here. No name, no phone number.

Stamped drawings includedFreight includedPrice locked at order

Stonebolt supplies building kits. Concrete, foundation work, erection labor and permits are by others. We don't offer or arrange financing.

Other states →

From the 3D model to the finished building

Scroll down to watch the model give way to the building as it stands today.

Finished: a tan steel industrial building on a white base with roll-up doors, in Massachusetts
3D model of the same industrial building
3D modelDelivered
Industrial building, Massachusetts.

Snow, salt air, and expensive land: what a Massachusetts metal building is built for

Snow is the primary structural consideration and it varies substantially across the state. On the coast and the Cape, salt air is a corrosion question that belongs in the specification. Freeze-thaw cycling is hard on anything that moves in a wall, which shows up in door and fastener life.

None of that means paying more than you should. It means your quote is engineered for Massachusetts from the start — sized to your site, not a generic building with the state name on it.

The specific design loads for your building come from its own location, not from the state. Your county, and in some places your elevation and distance from the coast, decide the numbers. We work them out from the address before we quote.

What gets built in Massachusetts

Metal buildings and steel buildings are the same product — the two names get used interchangeably, in Massachusetts and everywhere else. What changes is the frame inside, and what the building is being asked to do.

Land cost pushes buildings tighter and taller than the same operation would build elsewhere, and it makes covered storage more valuable per square foot than in most of the country. Marine storage is significant on the coast; contractor, trades and light industrial buildings make up most of the rest.

Most common here

  • Boat and marine storage
  • Contractor shops and yards
  • Light industrial and commercial
  • Garages and workshops

Where we deliver

Everywhere in Massachusetts, including outside the metros. Delivery to your site is included in the price of the building — not a separate line, and not something that shows up after you have committed.

Boston · Worcester · Springfield · Lowell · New Bedford · Cape Cod

One thing worth knowing in Massachusetts

Where land runs $200,000 an acre, the cheapest square footage you will ever buy is vertical. Tell us what has to stack or lift inside and we set the eave height around it, sized to your parcel.

Sizes Massachusetts buys most

SizeSquare feetStarting price
40 × 602,400$40,920
40 × 803,200$52,320
50 × 804,000$65,000
50 × 1005,000$80,250
60 × 1006,000$92,400

Building kit only. Concrete, foundation work and erection are separate. Starting prices, not quotes. Published prices and the eight price drivers →

Price your size and ZIP code in the estimator above →

Building kit only. Concrete, foundation work and erection are by others, and we will go over how the process works and what your contractor needs from us.

Drawings sealed in Massachusetts

Every Stonebolt building ships with stamped engineered drawings sealed by a professional engineer licensed in the state the building is going to — Massachusetts in your case — along with anchor bolt patterns and reaction plans, ready for your permit submission. That is included in the base price with no separate engineering fee.

Drawings are produced after an order is placed. That is true of every manufacturer, because they cost real money to produce. The difference is what you pay for them and whose seal is on them.

What the drawings include →

Ready to price your building?

Most Stonebolt projects start around $24,000 and run from 30 × 40 up. If that fits your budget, we'd like to hear about your project.