Snow load, and a lot of it: what a Colorado metal building is built for
Colorado is a snow problem, and the range within the state is enormous. A building on the eastern plains and one at eight thousand feet are not comparable structures — the mountain building carries several times the roof load, which means heavier frames, closer purlin spacing, and a genuinely higher price. Roof pitch matters more here than almost anywhere.
None of that means paying more than you should. It means your quote is engineered for Colorado from the start — sized to your site, not a generic building with the state name on it.
The specific design loads for your building come from its own location, not from the state. Your county, and in some places your elevation and distance from the coast, decide the numbers. We work them out from the address before we quote.
What gets built in Colorado
Metal buildings and steel buildings are the same product — the two names get used interchangeably, in Colorado and everywhere else. What changes is the frame inside, and what the building is being asked to do.
Ranch and equipment buildings across the plains and the western slope, workshops and garages on mountain property, and riding arenas — Colorado has a lot of horses and a long indoor season.
Most common here
- Equipment and hay storage
- Workshops and garages
- Riding arenas
- RV and vehicle storage
- Small commercial
Where we deliver
Everywhere in Colorado, including outside the metros. Delivery to your site is included in the price of the building — not a separate line, and not something that shows up after you have committed.
Denver · Colorado Springs · Fort Collins · Grand Junction · Pueblo · Durango
Buildings are manufactured in Colorado. Since delivery sits inside our price rather than on top of it, a shorter haul shows up as a lower number rather than as a smaller line you would have to go looking for.
One thing worth knowing in Colorado
Elevation is the first thing we ask about, and it is the single biggest driver of what a Colorado building costs. Your address gives it to us, and your quote is engineered around it.
Sizes Colorado buys most
| Size | Square feet | Starting price | Per sq ft |
|---|---|---|---|
| 40 × 60 | 2,400 | $40,920 | $17.05 |
| 50 × 80 | 4,000 | $65,000 | $16.25 |
| 60 × 100 | 6,000 | $92,400 | $15.40 |
| 80 × 100 | 8,000 | $120,800 | $15.10 |
| 100 × 150 | 15,000 | $219,000 | $14.60 |
Building kit only. Concrete, foundation work and erection are separate. Starting prices, not quotes. Published prices and the eight price drivers →
Price your size and ZIP code in the estimator above →
Building kit only. Concrete, foundation work and erection are by others, and we will go over how the process works and what your contractor needs from us.
Drawings sealed in Colorado
Every Stonebolt building ships with stamped engineered drawings sealed by a professional engineer licensed in the state the building is going to — Colorado in your case — along with anchor bolt patterns and reaction plans, ready for your permit submission. That is included in the base price with no separate engineering fee.
Drawings are produced after an order is placed. That is true of every manufacturer, because they cost real money to produce. The difference is what you pay for them and whose seal is on them.